PlanClipse Plugin

PlanClipse is a planning tool plug-in to the eclipse IDE. It provides you with the abilty to produce plans for a project in the form of a Gantt chart. The current plug-in and it's source is available to download here.

System Requirements

The plug-in works in both Windows and Linux, it has been tested in Windows XP and SUSE Linux. The system requirements for the plug-in are below the requirements for eclipse, and thus, if eclipse runs, so will PlanClipse.

Installation

Before opening Eclipse IDE, copy the downloaded JAR file into the plug-ins directory of the eclipse location.

  • [eclipse3.1\eclipse\plugins]
Open the IDE and the plug-in will be loaded along with all the other plug-ins. Once you have created your project for development of an application within eclipse, the time plan can be created.
      To create a time plan.
      Select File -> New -> Other -> ADEPT -> PlanClipse
      Complete the wizard.
When the plug-in opens, (by opening a PLN file) The first tab of the editor contains a user guide. There is also a user guide available in the latest version Installation

Releases

Feature Summary

Here is a summary of features (f) and bugs (b), which have already been fixed. It also includes features that are planed for future releases of PlanClipse.

Description

type

f/b

1.0

2.0

2.1

2.2

2.3














Add Task

f

r








remove Task

f

r








Task View

f

r


















Load Story cards

f


r







Calendar

f


r







Export to HTML

f


r

















crashes when load invalid story card file

b



r






Start point renamed start after

f



r






Specify durations in days

f



r






Project details text box size increased

f



r






Export to HTML month value was one below

b



r
















When clicked on a task, the same task gets selected in the view

f




r





Story card editor allows opt=exp=pes this causes problems once loaded

b




r





Icon

f




r





Linked HTML export page

f




r


Moved Wizard into ADEPT

f




r









Optional Extra tasks

f






Start dates for individual tasks

f






Fix percentage lines to include any percentage not just full days

f






change HTML to be shorter, some lines can be on the same line

f






Add start point to Dialog

f






Mark Milestones on the chart, maybe a Milestone view

f






View contain a task number

f